Stakeholders Participate in Trail walk through Niles Canyon

As part of the development of a Feasibility and Preliminary Engineering Study for a multiuse trail through Niles Canyon, Alameda County District 2 Supervisor Richard Valle arranged a trail walk among representatives of stakeholder groups through portions of the canyon. The trail walk took place on November 21, 2014 and was well attended. The delivery of the final feasibility study plan is still in the future however we have posted for information purposes the walk itinerary and notes from the walk.

Regarding the Caltrans plans for replacement of the Alameda Creek Bridge along Niles Canyon Road a check with the Project Coordinator at Caltrans Dist. 4 indicates that they currently expect to publish the Draft EIR/EIS in the January-February 2015 timeframe.

Below please find links to the Trail Walk Notes as well as the Walk Itinerary.
Notes from the Niles Canyon Trail Walk v3
NilesCanyonTrail_Itinerary(1)

This entry was posted in Misc. Bookmark the permalink.